词语站>英语词典>overburden翻译和用法

overburden

英 [ˌəʊvəˈbɜːdn]

美 [ˌoʊvərˈbɜːrdn]

v.  使负担过重

过去分词:overburdened 过去式:overburdened 现在分词:overburdening 第三人称单数:overburdens 

TOEFL经济

BNC.20075 / COCA.20715

牛津词典

    verb

    • 使负担过重
      to give sb/sth more work, worry, etc. than they can deal with

      英英释义

      noun

      • an excessive burden
          Synonym:overload
        1. the surface soil that must be moved away to get at coal seams and mineral deposits

          verb

          • burden with too much work or responsibility
            1. load with excessive weight

              双语例句

              • Numerical Analysis for Influence of Anti-seepage Measure of Deep Overburden Foundation on Seepage Field
                深覆盖层地基防渗措施对渗流场影响数值分析
              • Study on Underground Cutting Technique with Shallow Overburden and Environmental Effect of City Underpass
                城市人行地道浅埋暗挖施工技术及其环境效应研究
              • Application of radioisotope logging technique to the testing of the coefficient of permeability in the overburden layers of riverbed
                放射性同位素测井技术在河床覆盖层渗透系数测试中的应用
              • Ecologists point out that a cluster of high-rise buildings in a city often overburden public transportation and parking-lot capacities.
                生态学家指出,城市里的高层建筑群使公共交通和停车容量负担过重。
              • Stability analysis of loose surrounding rock with shallow overburden by a discretization finite element method
                一种浅埋松散围岩稳定性离散化有限元分析方法探讨
              • Dynamic Analysis of Asphalt Concrete Core Rockfill Dams on Deep Overburden
                深覆盖层上沥青混凝土心墙堆石坝动力分析
              • Application of Comprehensive Geophysical Method to Deep Overburden Layer Exploration in River Bed
                综合物探方法在河床深厚覆盖层勘探中的应用
              • The method of culvert-undercutting with shallow overburden is adopted to construct Beijing Xisihuan underground culvert of South-to-north Transfer Project.
                南水北调北京西四环暗涵施工中采用了浅埋暗涵施工法。
              • What can be done if the overburden is hard rock?
                如果剥离物是硬岩,怎么办呢?
              • Study on Debris Flow Forming Reasons in Overburden Layer During Transition Mining from Open Pit Mine to Underground Mine The oil workers drilled down another 10 feet to find oil.
                露天转地下开采覆盖层形成泥石流原因的研究在地下打洞石油工人为了开采石油又往下钻了10英尺。